PETROMIDIA waste water treatment plant characteristic is that the installation treats waste water from refining, from the petrochemical complex and from Năvodari sewage network, with a total flow of 38,360 m3/day. Mixing up those 3 different types of waste water leads to a difficult selection and designing of the treatment technology.